Originally, the Jai Hind metro station was planned to be elevated. Even so, the AAI objected which the elevated extend up into the airport could pose a danger to aircraft, so the route was further more reworked as well as station was shifted underground, 150 m through the Airport terminal creating. https://railway-recruitment67777.blogdomago.com/31296419/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf