Penmann has completed a complex HVAC upgrade at Danone Nutricia's Liverpool-based production site, providing a bespoke ventilation and climate control system built to comply with strict hygiene and production standards. The project covered the design, supply, installation and commissioning of high-specification HVAC systems across non-production, Medium Care (MC) and High https://growthbookmarks.com/story20602749/penmann-delivers-comprehensive-hvac-refurbishment-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2